2008年9月8日 星期一

Ceiling Installation

The size of the area with plywood ceiling is only 3.5M by 2.1M, a little bit over 2 Ping.

It took 3 carpenters to work for 1 full day to complete it. The ceiling is finished with one layer of melamine, so that it will be water resistant.

Mr.Tsai, the foreman, is the one who did the carpentry work of the small room built at front end of this house 4 years ago. He is good.

Now the bath room looks beautiful. I am now coordinating the delivery of plumbing fixtures: Water closet, lavatory, and the glass partition of shower room. Hopefully we can have all these fixtures installed before this Friday.

沒有留言: